The project is located in the coastal area of kayao and will extend the existing coastal green coastal highway by 4.63 kilometers, with two-way five lanes. The construction contents include subgrade excavation and backfilling, structural layer, asphalt concrete pavement, green landscape belt along the line, seawall protection works, sidewalk works, leisure sites, etc.
आपूर्तिकर्ता की ओर से उत्पाद के विवरण
ऑर्डर किए जाने वाले उत्पाद की न्यूनतम संख्या: 240 नग